attached, slides showing :
K2020, Public transport for Gothenburg region Long term strategy and structure
Adopted september 2007, and the long term development program adopted in april 2009.
The system will be developed with six levels
you can download at this link:
at this link http://www.steekr.com/
with:
Login : CERTUBHLS
Password : CERTUBHLS